Laserfiche WebLink
14 0 0 Page 3 of 3 <br />To: Robert McClellon [EH] <br />Cc: Joyesh Chandra; Jayna Rutz; Schneider, Eric A <br />Subject: Handling ash -containing soil at Corral Hollow <br />Hello Robert, <br />As you know, our plan was that PSC truck drivers locate their bins on a truck to receive ash - <br />containing soil, driving off when the bin was full. Our arrangement with PSC was for Wednesday <br />and Thursday, based on our estimate of the amount of ash -containing soil that needed to be <br />removed. <br />However, we found that more ash -laden soil needed to be removed than we anticipated. Because <br />PSC could not provide a driver for today (Friday), and because RJ needs to proceed with the work, <br />we will ask RJ Gordon to stockpile any ash-contining soil they remove today over by the flare <br />station. <br />PSC can provide a driver on Tuesday (first work day of that week), and normal removal practices <br />will resume. THE stockpiled material will be removed from the site along with the other ash - <br />containing soil at the earliest opportunity. <br />Please call with any questions. <br />Best regards, <br />Mike <br />W. Michael Carroll, PE <br />Senior Civil Engineer, Public Works/Solid Waste <br />Phone (Direct): 209-468-8504 <br />6/3/2013 <br />