Laserfiche WebLink
requirements of section 21140 without the need for corrective action. <br /> (h! The operator shall submit the plant RWQCB, EA, and CalRecycle for review 0 <br /> approval in accordance with the <br /> ' schedule in section 21860. <br /> (1) The corrective action plan shall be prepared and certified by a third party who meets all of the following <br /> conditions; <br /> (A)Is a registered civil engineer or certified engineering geologist, <br /> (B)Is not employed by the current entity responsible for the design of the solid waste landfill; <br /> (C)Is not the current professional in responsible charge of work for the design of the solid waste landfill,and <br /> (D)Is not employed by an entity or its subsidiary, parent, or other similarly related entity under common control that <br /> owns or operates the solid waste landfill. <br /> (2)For the purposes of(c)(1)(B)and(C), the current entity responsible for the design and the current professional in <br /> responsible charge of design work are the entity and registered civil engineer or certified engineering geologist <br /> responsible for the design pursuant to section 21600(b)(4)(B)in the conditioning JTD/RDSI, including all subsequent <br /> RFI amendments as applicable and approved, listed in the most recently issued solid waste facility permit and <br /> pursuant to section 21780 in the approved final closure plan. <br /> 22103. CalRecycle-Updated Corrective Action Cost Estimate. <br /> (a) The operator shall submit an updated corrective action estimate prepared pursuant to section 22101(a)and an <br /> updated corrective action estimate or corrective action plan prepared pursuant to section 22101(b)each time closure <br /> and postclosure maintenance plans are required to be submitted pursuant to section 21865. <br /> (1) The updated cost estimate shall be based on the current unit costs. Cost estimate adjustments based only on <br /> inflation factors are not acceptable. <br /> 21865.CalRecycle-Amendment of Closure and Postclosure Maintenance Plans. <br /> (a)Closure and postclosure maintenance plans shall be submitted every time a review or revision of the SWFP is <br /> conducted. If there have been no changes requiring an amendment under the(c)criteria, a statement certified by a <br /> registered civil engineer or certified engineering geologist that there have been no changes may be submitted in lieu <br /> of submitting plans. <br /> (1)For disposal sites without a solid waste facilities permit, the operator shall initially submit updated plans in <br /> accordance with the following schedule; <br /> (A)If the approval of Certification of Closure pursuant to section 21880 occurred on or after January 1, 1988 but prior <br /> to January 1, 1997, the operator shall submit updated plans on or before July 1, 2012; <br /> (B)If the approval of Certification of Closure pursuant to section 21880 occurred on or after January 1, 1997 but prior <br /> to January 1, 2001, the operator shall submit updated plans on or before July 1,2013; <br /> (C)If the approval of Certification of Closure pursuant to section 21880 occurred on or after January 1,2001 or if the <br /> operator has initiated closure activities on of before February 25,2003, but has not received approval of Certification <br /> of Closure pursuant to section 21880, the operator shall submit updated plans on or before July 1,2014. <br /> (2)After complying with (1), the operator shall submit updated plans at least once every five years. <br /> (b) The plans shall be submitted as part of the JTD or a separate document in the form of a distinct component of a <br /> JTD. The form of submittal shall be as amendments to the existing plans as necessary. Submittal shall be in <br /> accordance with section 21780. The evaluation and approval of the plans shall be as specified under section 21860. <br /> (c) The plans shall be amended to reflect the following: <br /> (1)Any change in <br /> (A)Operation or solid waste landfill design which would affect the implementation of the closure and/or postclosure <br /> maintenance plans, <br /> (B) The anticipated year of closure, <br /> (C) The financial mechanism required pursuant to section 22227, "Substitution of Mechanisms"or section 22231, <br /> "Cancellation or Nonrenewal by a Provider of Financial Assurance".and <br /> (2) Updates of the cost estimates shall be based on the current costs on a unit basis(unit costs)for closure and <br /> postclosure maintenance. Cost estimate adjustments based only on inflation are not acceptable <br /> 3 <br />