My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:42:28 PM
Creation date
4/21/2021 3:36:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2013
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jurisdiction. Thanks..................Gino <br /> Chapter 4. Documentation and Reporting For Regulatory Tiers,Permits,WDRs,and Plans <br /> Subchapter S.CalRecycle-Corrective Action Cost Estimate and Plan Requirements <br /> 22100.CalRecycle-Scope and Applicability. <br /> (a) This subchapter applies to owners and operators of all disposal facilities that were or are required to be permitted <br /> as solid waste landfills and have been or will be operated on or after July 1, 1991. <br /> (b) The operator shall provide cost estimate(s)and a plan, as appropriate,for initiating and completing know or <br /> reasonably foreseeable corrective action pursuant to section 22101. <br /> (c)For the purpose of this subchapter, the following definitions apply: <br /> (1) "Corrective action"means an activity, including restoring the integrity or establishing the adequacy of a damaged <br /> or inadequate containment structure or environmental monitoring or control system, to:bring a landfill into <br /> compliance with the applicable requirements,prevent a reasonably foreseeable release, or remediate a known <br /> release to the environment. Corrective action does not include routine maintenance. <br /> (2) "Causal event"means an occurrence that could result in a non-water release corrective action. Causal events <br /> include, but are not limited to, earthquakes,flooding, tsunami,seiche,fire, precipitation, and degradation of or <br /> otherwise inadequate containment structure or environmental monitoring or control system. <br /> 22101. CalRecycle-Corrective Action Estimate Requirements. <br /> (a) Water release corrective action estimate <br /> The operator shall provide a cost estimate for initiating and completing corrective action for all known or reasonably <br /> foreseeable releases from the solid waste landfill to water in accordance with the program required by the SWRCB <br /> pursuant to section 20380(b). <br /> (b)Non-water release corrective action cost estimate <br /> (1)Effective Julyl,2011, on or before the date of the first permit review or revision or plan review as determined by <br /> the schedule in section 21865, the operator shall also provide a cost estimate for the complete replacement of the <br /> final cover. The operator shall calculate this cost in one of the following two ways: <br /> (A)By providing a new estimate of the cost of complete replacement of the final cover, including, but not limited to, <br /> the cost of removing the existing cover and preparing for and installing the new cover, as necessary, depending on <br /> the replacement final cover system design:or, <br /> (B)By providing the greater of either the most recently approved or most recently submitted closure cost estimate, <br /> adjusted, as necessary, to reflect closure of the entire solid waste landfill and current unit costs. <br /> (2)The operator, in lieu of providing a separate corrective action cost estimate pursuant to(b)(1)(A)or(B), may <br /> provide a site-specific corrective action plan, as described in section 22102. <br /> (c)A cost estimate prepared pursuant(a)or(b)must be a detailed written estimate, in current dollars, of the cost of <br /> hiring a third party to perform all applicable corrective action activities for the entire corrective action period. <br /> (d) The operator shall prepare the cost estimates in accordance with the requirements of section 21815. <br /> (e) The operator shall increase the cost estimate if changes in the corrective action program, corrective action plan, <br /> or landfill conditions increase the maximum cost of corrective action. <br /> (f) The operator may only reduce the amount of the cost estimate if the cost estimate exceeds the maximum <br /> remaining corrective action costs and the reduction is approved pursuant to(g). <br /> (1) The operator shall provide the cost estimate prepared pursuant to(a)to RWQCB for review and approval and <br /> shall provide a copy of this estimate to CalRecycle. <br /> (2) The operator shall provide the estimate prepared pursuant to(b) to RWQCB, EA, and CalReycle for review and <br /> approval in accordance with the schedule in section 21860. <br /> 22102. CalRecycle-Corrective Action Plan Requirements. <br /> (a)A corrective action plan submitted to comply with section 22101(b)(2)must include: <br /> (1)An evaluation of the know or reasonably foreseeable non-water release corrective action needed as a result of <br /> each known or reasonably foreseeable causal event; <br /> (2)Cost estimates,prepared pursuant to section 22101(c)-(f),for all know or reasonably foreseeable corrective <br /> actions described in the plan. The cost estimate with the highest amount must be used to determine the amount of <br /> financial assurance required pursuant to section 22221(b)(2);and <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.