Laserfiche WebLink
46 Page 2 of 2 <br />implementation of this recent requirement, the following documents are attached. <br />1. LEA CAP guidance — This document provides general background and implementation information <br />for the non -water release CA requirement. <br />2. CA Estimate Status —This document provides the current status of CA estimates and plans, if <br />appropriate, submitted to CalRecycle. <br />3. CA Estimate Due Date — This document presents the estimated due date for CA estimates and <br />plans. Please note that this document was prepared based on January 2011 SWIS data. A number <br />of caveats are included in the notes on the spreadsheets. Staff is in the process of preparing an <br />updated spreadsheet with more current information. However, for most landfills, the due date <br />should still be appropriate. <br />In addition to the above documents, CalRecycle has prepared guidance, including FAQs, concerning this <br />topic. The guidance may be found at: <br />http://www.calrecycle.ca.gov/LEA/Reps/Im plementZPostclosure/default.htm. <br />Should you have any questions concerning the above matter, please contact Michael Wochnick in the <br />Engineering Support Branch at 916-341-2869 or by email at michael.wochnick@calrecycle.ca.gov. <br />This Announcement is being Sent on Behalf of the Closure & Technical Support Section, CalRecycle <br />3/29/2013 <br />