Laserfiche WebLink
r <br />Page 1 of 1 <br />From: <br />Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: <br />Wednesday, April 10, 2013 2:39 PM <br />To: <br />Natalia Subbotnikova [EH] <br />Cc: <br />Michael Carroll <br />Subject: <br />Soil Gas Well—Inst Permits—Corral Hollow LF <br />Attachments: CH_Soil Gas MW9 _Approved_CalTrans Encroachment Permit_12-6-12.pdf; Gregg Drilling_EHD <br />DRILLER LCD.pdf <br />Hello Natalia <br />Attach, please find the approved Caltrans Encroachment Permit and the Driller LCD for <br />the final approval of the soil gas well installation permits submitted to EHD in November <br />2012. 1 will update the project's construction schedule dates identified in the work plan <br />with the realistic construction schedule and then email you the revised page of the work <br />plan. <br />Thanks <br />JOYESH CHANDRA <br />SAN JOAQUIN COUNTY <br />PUBLIC WORKS DEPARTMENT <br />SOLID WASTE DIVISION <br />1810 E. HAZELTON AVE <br />STOCKTON, CA 95201 <br />PH: (209) 468-3066 <br />FAX: (209) 468-3078 <br />Emai1:ichandra@si4ov.or4 <br />4/10/2013 <br />