My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:42:28 PM
Creation date
4/21/2021 3:36:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2013
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 <br />JrJtr4rAP# <br />CONSTRUCTION, INC. <br />P.O. BOX 23204 2086 MONUMENT BLVD. PLEASANT HILL, CA 94523 (925)680-8660 <br />on the well schedule. No drilling muds or liquids shall be used. Refuse and soil with refuse removed <br />during drilling shall be disposed of in a San Joaquin County provided roll -off bin and all refuse shall be <br />covered at the end of each working day with a plastic sheet. If any well bore hole is to be left open at <br />the end of the work day, the opening of the bore hole shall be securely covered with plywood and <br />cordoned off with barricades and caution tape. Cal OSHA Health and Safety requirements shall be <br />strictly enforced. <br />A well schedule is included on page seven of the Project Drawings. Well depths will be from 25 feet to <br />66 feet below ground surface as shown in the well schedule. <br />Construction of the extraction wells will be performed by RJG as shown on detail 1, page 7, of the <br />Project Drawings. Four inch HDPE SDR11 pipe shall be used for the well casing and shall be suspended <br />and centered in the bore hole using a pipe hanger while backfill materials are placed in the bore hole as <br />shown in the well detail. <br />Schedule <br />RJG anticipates the Extension of Closure Cap Project to begin on May 6th, 2013 and the well boring work <br />to begin on May 16th, 2013. The seven gas extraction wells are expected to be completed with three <br />days. RJG will provide 48 hours notice to the Environmental Health Department prior to beginning any <br />well boring and well installation. <br />Health and Safety <br />RJG adopts the San Joaquin County Department of Public Works, Site Specific Health and Safety plan as <br />part of this work plan. All Cal OSHA Health and Safety requirements shall be enforced. <br />CA Contractors License No. 616851-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.