My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 10:55:49 AM
Creation date
4/29/2021 10:35:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL, -PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />T1: 87 M <br />T2: 91 <br />T3: Diesel <br />Are both vent and tank riser piping <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />secondarily contained? <br />N No <br />N No <br />N No <br />❑ No <br />OPE Model <br />846390-109 <br />846390109 <br />846390109 <br />What is the OPE response when activated? <br />❑ Shut off <br />❑ Shut off <br />❑ Shutoff <br />❑ Shut off <br />(Check all that apply.) <br />Flow <br />Flow <br />Flow <br />Flow <br />N Restricts <br />N Restricts <br />N Restricts <br />❑ Restricts <br />Flow <br />Flow <br />Flow <br />Flow <br />N Audible <br />N Audible <br />N Audible <br />❑ Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />N Visual <br />N Visual <br />N Visual <br />❑ Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping <br />N Yes* <br />N Yes* <br />N Yes* <br />❑ Yes* <br />that may interfere with the OPE operation? <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />At what level in the tank is the OPE set to <br />99.08 <br />98.63 <br />99.74 <br />activate? Inches from bottom of tank <br />What is the percent capacity of the tank at <br />90 <br />90 <br />90 <br />which the OPE activates? <br />Is the OPE in proper operating condition to <br />N Yes <br />N Yes <br />N Yes <br />❑ Yes <br />respond when the stored substance <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />reaches the designated regulatory level? <br />7. ;SUMMARY OF TESTINGRESULTS <br />N Pass <br />❑ Pass <br />❑ Pass <br />❑ Pass <br />OPE Inspection Results <br />❑ Fail <br />N Fail <br />N Fail <br />❑ Fail <br />8. COMMENTS <br />Describe all results marked "Fail" and each proposed remedy. <br />1) Only one tank passes the OPEI but will not activate next alarms <br />unless the first alarm has been cleared. <br />2) OPW Drop tubes with overfill prevention valves will be installed <br />3) A permit with SJCEHD has been submitted <br />* Mark here if: <br />❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup reports) <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.