Laserfiche WebLink
Preliminary Subsurface Investigation Work Plan <br />MOCK PROPERTY <br />2509 to 2511 North West Lane, Stockton, California <br />TABLE OF CONTENTS <br />SECTION PAGE <br />1.0. INTRODUCTION 1 <br />2.0. BACKGROUND 1 <br />2.1. REGIONAL GEOLOGIC/HYDROGEOLOGIC SETTING 1 <br />2.2. UNDERGROUND STORAGE TANK REMOVAL 2 <br />2.3. PREVIOUS SITE ASSESSMENTS 2 <br />3.0. SCOPE OF WORK 3 <br />3.1. PRE-FIELD WORK TASKS 3 <br />3.2. SOIL SAMPLE COLLECTION AND ANALYSIS 3 <br />3.3. GRAB GROUND WATER SAMPLE COLLECTION AND ANALYSIS 4 <br />3.4. REPORT PREPARATION 4 <br />4.0. FIELD PROCEDURES 5 <br />4.1. PROBE BORING ADVANCEMENT 5 <br />4.1.1. Soil Sample Collection and Analysis 5 <br />4.1.2. In-situ Ground Water Sampling Procedures 5 <br />4.2. EQUIPMENT DECONTAMINATION 6 <br />4.3. BORING ABANDONMENT 6 <br />5.0 REFERENCES 6 <br />FIGURES <br />Figure 1 - Location Map <br />Figure 2 - Site Plan (with proposed boring locations) <br />APPENDIXES <br />Appendix A - Site Septic System Diagrams