Laserfiche WebLink
Lee Gardiner 2 11 July 2003 <br />CALAMCO <br />San Joaquin County <br />The technical report shall describe how the Discharger proposes to collect groundwater samples and <br />include an implementation time schedule. Additionally the technical report should provide the status of <br />implemented procedures and modifications outlined in the 28 May 2003 report. This technical report is <br />needed to ensure the facility operations are protective of water quality. A professional shall prepare the <br />technical report required as by the California Business and Professions Code. The Discharger shall <br />certify the technical report as specified in the Standard Provisions General Reporting Requirements D.6. <br />The Report of the 23 April 2003 Inspection is enclosed for your information. If you have any questions <br />please contact George Lockwood at (916) 255-3022 or E-mail address lockwog@rb5s.swrcb.ca.gov. <br />PATRICIA H. LEARY, Chic <br />NPDES Unit <br />Delta Watershed <br />Enclosure 23 April 2003 Inspection Report <br />cc w/o end l A. Richard Aschieris, Port of Stockton, Stockton <br />Donna Heran, San Joaquin County Environmental Health Department, Stockton