My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1992-1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1992-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 4:34:37 PM
Creation date
5/7/2021 8:39:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1992-1993
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rim Schwab <br /> January 28, 1992 <br /> Page 4 <br /> Response: <br /> The County hired Kleinfelder, Inc. to prepare and implement the CQA <br /> Plan for closure of the Harney Lane Sanitary Landfill . Comments <br /> 8-12 are addressed in the new CQA Plan (Appendix C of Closure <br /> P1 an) . <br /> Comment 13: <br /> "The section on sheepsfoot compactor operation indicates that the <br /> compactor operator may have to run the water truck. This would <br /> seem to be a very awkward process." <br /> Response: <br /> During construction of the final cover layer, an experienced <br /> operator will be assigned to each piece of equipment. <br /> Comment 14: <br /> "In Section I-9.0 on page 8, the closure plan indicates that two <br /> permanent monuments will be installed and every five years aerial <br /> surveys, topographic maps, and iso-settlement maps will be <br /> completed. None of these costs are identified in either the <br /> closure or postclosure cost estimates sections. Please clarify. " <br /> Response: <br /> The cost estimate sections of the closure and postclosure <br /> maintenance plans have been revised to include costs for these <br /> tasks. <br /> Comment 15: <br /> 1114 CCR 17776(f) requires the operator to prepare calculations <br /> based on the final site configuration to determine anticipated <br /> differential settlement of the site during the postclosure <br /> maintenance period. Please include the required calculations in <br /> the revised plan. " <br /> Response: <br /> Section 5.1 of the Postclosure Maintenance Plan has been revised to <br /> include a method of calculating differential settlement during the <br /> postclosure maintenance period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.