Rim Schwab <br /> January 28, 1992 <br /> Page 4 <br /> Response: <br /> The County hired Kleinfelder, Inc. to prepare and implement the CQA <br /> Plan for closure of the Harney Lane Sanitary Landfill . Comments <br /> 8-12 are addressed in the new CQA Plan (Appendix C of Closure <br /> P1 an) . <br /> Comment 13: <br /> "The section on sheepsfoot compactor operation indicates that the <br /> compactor operator may have to run the water truck. This would <br /> seem to be a very awkward process." <br /> Response: <br /> During construction of the final cover layer, an experienced <br /> operator will be assigned to each piece of equipment. <br /> Comment 14: <br /> "In Section I-9.0 on page 8, the closure plan indicates that two <br /> permanent monuments will be installed and every five years aerial <br /> surveys, topographic maps, and iso-settlement maps will be <br /> completed. None of these costs are identified in either the <br /> closure or postclosure cost estimates sections. Please clarify. " <br /> Response: <br /> The cost estimate sections of the closure and postclosure <br /> maintenance plans have been revised to include costs for these <br /> tasks. <br /> Comment 15: <br /> 1114 CCR 17776(f) requires the operator to prepare calculations <br /> based on the final site configuration to determine anticipated <br /> differential settlement of the site during the postclosure <br /> maintenance period. Please include the required calculations in <br /> the revised plan. " <br /> Response: <br /> Section 5.1 of the Postclosure Maintenance Plan has been revised to <br /> include a method of calculating differential settlement during the <br /> postclosure maintenance period. <br />