My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1992-1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1992-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 4:34:37 PM
Creation date
5/7/2021 8:39:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1992-1993
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kim Schwab <br /> January 28, 1992 <br /> Page 5 <br /> Comment 16: <br /> This comment addresses the previously submitted Slope Stability <br /> Analysis. This analysis did not address all requirements according <br /> to 14 CCR 17777. <br /> Response: <br /> Kleinfelder, Inc. prepared a revised slope stability analysis to <br /> meet the requirements of 14 CCR 17777. The revised slope stability <br /> analysis is included as Appendix B of the Final Closure Plan. <br /> Comment 17: <br /> "What security measures are in place or are proposed to protect the <br /> drainage detention basin form unauthorized entry (14 CCR 17778 (f) <br /> (3) ) ? Closure cost estimates are provided for additional fencing, <br /> but there is no description of the existing and proposed fencing. <br /> Please elaborate in text in order to clarify closure cost <br /> estimates. " <br /> Response: <br /> The revised plan does not show any additional fencing. The current <br /> fencing consists of a perimeter four strand barbed wire fence. The <br /> entrance on Harney Lane is protected by a locked chain link gate. <br /> The current fencing will be adequate to protect against <br /> unauthorized entry. <br /> Comment 18: <br /> "Provide a run-off analysis for sheet and rill erosion to predict <br /> the soil loss or potential loss under various conditions (14 CCR <br /> 17779 (h) ) . - <br /> Response: <br /> Section 12 of the Closure Plan includes calculations predicting <br /> annual soil loss using the Universal Soil Loss Equation. <br /> Comment 19: <br /> "Leachate must be monitored in accordance with 14 CCR 17781 (c) . <br /> The operator must monitor leachate quality and for the accumulation <br /> of leachate. Both the quantity and quality of leachate must be <br /> monitored at least quarterly or whenever ground water samples are <br /> collected (14 CCR 17781 (b) (2)) . In addition to the sampling <br />
The URL can be used to link to this page
Your browser does not support the video tag.