Laserfiche WebLink
4 <br /> OpgUily C <br /> )fie '.OG <br /> u q ^a COUNTY OF SAN OAQUIN EUGENE B. DELUCCHI <br /> to ` DEPARTMENT PUBLIC WORKS DEPUTY DIRECTOR <br /> P. 0. BOX 1810 - 1810 E. HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON, CALIFORNIA 98201 DEPUTY DIRECTOR <br /> C4�i*P 60 (209) 944-2281 <br /> HENRY M. HIRATA Ric Faaly J� <br /> DIRECTOR <br /> May 12f 19B7 MAY 2 0 1987 <br /> ENVIROMENTAL HEALTH <br /> Ronald Valinoti FERMIT I <br /> Director of Environmental Health Division <br /> San Joaquin Leal Health District <br /> 1601 East Hazelton Avenue <br /> P.O. o x 2009 <br /> Stockton, California 95201 <br /> Rea PRE-WINTER PREPARATION FOR HARNEY LANE SANITARY LANDFILL <br /> PERMIT 39-AA-003 <br /> Dear ,Mr . lea l i no t e <br /> In accordance with the requirement of part E®A of the Solid <br /> Waste Facilities permit for the Harney Lane Sanitary Landfill , <br /> the following Winterization Plan is submitted for your review® <br /> LOCATION OF WINTER DISPOSAL SITE <br /> The Closure Plan for the site requires placing additional lifts <br /> of waste over the top of the site, to develop a 3% final grade <br /> slope as required by Subchapter 1 , Chapter 3 of Title 23 of <br /> the California Administrative Code® The 9/88 Winter Plan will <br /> bring a portion of the site to final grade according to the <br /> Closure Plana Areas to receive waste according to the Winter <br /> Plan are shown on Attachment A which is a copy of the Closure <br /> Plan drawing for the site showing -Final grades, portions of the <br /> landfill currently at final grade and 87/88 winter phasing for <br /> filling operations® <br /> In preparation for winter disposal operations a new pad will b <br /> constructed during the summer of 1987. This pad will be <br /> located as shown on Attachment A as Area A. This pad will be <br /> elevated above surrounding areas and graded to drain® This <br /> will enable utilization of this pad for the winters of 7f <br /> through and including 9/90 when the site (primary site) will <br /> be closed by filling to final grade® <br /> During the period of November 1 , 1987 through April 30, 198 <br /> about 100,000 compacted cubic yards (CY) of space will be <br /> consumed by placing waste in Areas 1 through 3 as shown on <br /> Attachment A. Area 1 will be filled with a first lift and <br /> sloped to drain westward at 1%. Next , Area 2 which is the <br /> existing winter pad for commercial customers will be brought to <br /> final grade with 3% slopes. Finally a final lift will be <br /> placed over Area 3 and Area 1 to bring both Areas to finished <br /> grade® (This final lift will be placed over a first lift which <br />