i • <br /> I . QUANTITIES FOR SITE FILL PLANNING: <br /> Following are waste quantities used for site construction planning . These <br /> quantities are derived from past gate cubic yard quantities. A compaction <br /> factor of 0.35 has been derived for the site using the site volume consumed <br /> from late 1985 until April 1987 and dividing by the uncompacted waste gate <br /> quantities for the same period . Using this factor future site space <br /> consumption can be planned as shown below. <br /> Incoming uncompacted waste quantities in cubic yards: <br /> Assume 50,000 CY. /mo . (Nov to Feb ) <br /> Assume 60,000 CY. /mo . (Mar to Oct ) <br /> Calculated current compaction factor for the site is 0.35 using estimated <br /> volume remaining in late 1985 until April 1987 (spreadsheet "Harnvol2) to <br /> figure current sorage remaining . <br /> Therefore the following compacted volumes for .vaste are used assuming an <br /> 80'/./20:: split for commercial and public waste volumes. <br /> Consumption of landfill space including daily cove7 : <br /> Mor.-hs Commercial ICY/moa Public CCY/mol Total/mo . <br /> (per day ) ( per day ) (per day ) <br /> Nov - =eb 14 , 000 3,500 17,500 <br /> ( 467 ) ( 120 ) (583) <br /> Mar - Oct 16, 800 4,200 21 ,000 <br /> (560) ( 140 ) (700) <br /> II . Operations phasing for the primary site is shown below. Areas for <br /> completion are numbered in chronological order and are shown on the attached <br /> map . Numbers followed by a "W" indicate an area tnat will be filled during <br /> winter months. Typically , the commercial and public users will be fill - ng in <br /> the same location . The volumes of compacted waste and cover material and <br /> approximate dates of completion are shown in the remaining columns. <br /> The schedule shown below indicates that a minimum 1% slope will be completed <br /> over the entire site by December 1988 and that a minimum 3% slope for the <br /> entire site which corresponds to final closure of the primary site will be <br /> completed in April of 1990. It should be noted that these completion dates <br /> show an earlier completion date than the closure plan for the site because <br /> actual waste volumes to date exceed those projected in the closure plan. The <br /> actual completion dates for construction shown below may be fine tuned as <br /> completion occurs based on possible changes in compaction factor or incoming <br />