Laserfiche WebLink
' <br /> ~ <br /> waste volumes should they occur , however , it shows the latest projection based <br /> on current conditions for the site as of April 19B7 . <br /> II . OPERATIONS PHASING FOR THE PRIMARY SITE: <br /> Description Volume CY days Dates <br /> Area or Location (vol/day C\') <br /> 1 pad 10` high 75,000 107 4/15-B/2/B7 <br /> 21-26E/ 17-19N (560+140) <br /> 2 Road to pad 5,000 7 B/2-8/9/87 <br /> (56O+14O) <br /> 3 drainage ditch @25E 4,000 6 B/9-B/ 15/E7 <br /> 20-25N ( 560+140 ) <br /> 4 first lift ( 6"ave) 50,000 71 B/15-11/1 /E7 <br /> 19-22N/23-29 .7E (560+140) <br /> 5W first lift 15,000 26 11/1-11/27/B7 <br /> 19-22N/21-23E (460+120) <br /> 6W old comm. pad to 19,000 32 11/27-12/---O/B7 <br /> grade @26N (460+120) <br /> 7W 14-17N/22-30E 45,000 77 ' 1 / 1-3//20/BB <br /> first lift (460+120) <br /> B 10-13N/23-30E 16,000 23 3/20-4/12/BB <br /> (560+14O) <br /> 9 22-27N/25-29E 20,000 2B 4/12-5/9/BB <br /> (56O+140) <br /> 10 10-15N/ 17-22E 29,000 4{) 5/10-6/20/B8 <br /> (560+14O) <br /> 11 31-34N/17-20E 17,000 24 6/20-7/14/BB <br /> (560+140) <br /> 12 27-31N/17-20E 369000 50 7/14-9/2/68 <br /> (560+14O) <br /> 13 22-27N/ 17-19E 40,000 57 9/2-11/1/BB <br /> (560+140) <br />