Laserfiche WebLink
14W* 15-22N/17-19E 30,000 51 11/1-12/20/B8 <br /> first lift (460+120) <br /> ( this sequence will complete minimum 1% slope over site) <br /> 15W 19-22N/21-29E 67 ,000 115 12/20/88 to <br /> 17-18N/27-29E (460+120) 4/15/09 <br /> second lift <br /> 16 15-17N/ 19-22E 30,000 43 4/15-5/2e/89 <br /> (560+140) <br /> 17 22-25N/21-26E 45,000 64 5/20-2/1/09 <br /> (560+140) <br /> le 29-34N/20-23E 30,000 43 /1/e9-9/ 13/09 <br /> except road (560+140) <br /> 19W 15-21N/17-20E 60,000 103 9/, 13-12/25/09 <br /> 2nd lift (460+120) <br /> 20W 14-17N/22-30E 45,000 76 12/25/09 to <br /> final lift (460+120) 3/12/90 <br /> 21W 19-22N/21-25E 15,000 21 3/12-4/3/90 <br /> final lift +pad (560+140) <br /> TOTAL 692,000 CY <br /> The total =f 692,000CY checks with 684,000CY (within 1%) total from <br /> April 1927 spreadsheet from latest topographical survey. <br /> * Corresponds to a minimum 1% slope over the entire site. <br /> l <br />