My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1972-1986
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1972-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 5:21:37 PM
Creation date
5/7/2021 8:41:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1972-1986
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 29, 197' <br /> HARNEY LANE LANDFILL <br /> Description of Site Operation <br /> We can classify the operation as a cut & cover system. The material used <br /> for cover has been stockpiled from areas that ,iave been excavated for waste <br /> disposal. <br /> The Harney Lane Landfill is being utilized as a class II site. <br /> We do not use a compactor to compact the waste material. As the waste <br /> is moved to the. fill area by a dozer, we estimate a_compaction of the waste to <br /> be approximately 2 to 1. <br /> -UENOMNM � <br /> The Harney Lane Landfill is open to the public from 8:00 a.m. to 5100 A.m. <br /> every week with the site only being closed for 3 holidays each year which are <br /> Thanksgiving, Christmas and New Year's Day. <br /> ZL11 vehicles bringing waste to the site are directed to the proper location <br /> for discharge. The solid waste delivered by the public or the Contract Carrier's <br /> are using the same disposal area. Septage to be discharged is being mixed <br /> with the days waste to be sure we do not produce an odor or rodent problem and <br /> then placing fill material over the waste at the end of the day. <br /> Equipment used for the landfill operation includes: <br /> 1/2 Ton Pick-up <br /> dW <br /> Scraper <br /> _111is-Chalmer Dozer-#J)� ?% <br /> ;Caterpillar D6 Dozer (Standby) <br /> Water Truck <br /> RgaI& p 4A _LL"s are located by the main entrance inside the storage <br /> building. A well is located in this area as well with a storage tank adjacent <br /> to it. <br /> Adverse weather conditions will make daily operations somewhat more difficult, <br /> however the landfill continues to function. Deliveries during this type of weather <br /> are usually by the Contract Carrier's, therefore the quantity delivered to the <br /> site is considerably less. <br /> Equipment operation nois�els have not affected neighboring individuals : <br /> as the landfill operation covers a large area and any equipment noise would be <br /> intermittent. The Migrant Labor Camp to the west is occupied only on a seasonal <br /> basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.