Laserfiche WebLink
WE OF cA THE RUCtOM A <br /> *AUFORNIA WASTE MANAGEMENT BOARD <br /> zi® twm 5MM, sR WO <br /> cA 14n. <br /> March 11, 1983 <br /> Mr. Roger Nicholson <br /> San Joaquin Co® Public Works <br /> P.O. Box 1810 <br /> Stockton, CA 95201 <br /> Subject: Harney Lane Landfill and Lovelace Transfer Station Permit Reviews <br /> Dear Mr. Nicholson: <br /> Your Local Enforcement Agency ) has scheduled a. ravtaw of your solid wasta <br /> facility permit(s) for fiscal year 1983/84, and will be in contact with you to <br /> vise you about the review procedure as well as to discuss with you the engineering <br /> requirements for a facility review,.- and to arrive, atreview,.— a compatible date- for a <br /> copy of the completed report to be provided to the: <br /> The C o __ nment Code,. Title 7.3, Section 66796.33(d) and the California <br /> Administrative Code Title 14- Section 18213, require t an permitted solid <br /> vaste ties- , transfer/processing stations, composting operations, <br /> sludge disposal operations, etc.) shall be reviewed. by- the Local Enforcement <br /> Agency (LEA) ' tbA� Waste Management Board five. years after the permit's issuance, <br /> most. recent modification, most recent revision., or most recent review. <br /> LANDFILLS: In conjunction with the permit review,. the California Administrative <br /> Code, Title 14 Section 17751, requires the ,owner or operator of' landfills to <br /> have a•registered civil engineer review the site design, implementation and <br /> operation plan at least every five years to. determine if any revisions are <br /> necessary, to estimate the remaining to life., It is the. civil eer's _ <br /> responsibility _ - off ic y certify that the site's d d operation -plan _ <br /> will le the facility to meet health and safetycriteria and assura -that all <br /> Provisions of the-.State Minimum S - for Solid Waste Handling and Disposal <br /> cont a to be met. The conclusions recommendations of this review are to <br /> be presented in a report and filed with the LEA and the Board for consideration <br /> during the 5 year review of the permit. <br /> TRANSFER STATIONS-,.— Prior to submitting your permit. application to the LEA for <br /> review, please review the Plan of Operation (small volume transfer station) or <br /> Report of Station.-Information (large vol e- tz fer station) . If there are an3r <br /> changes or additions to be made, please a then with the application. <br /> Please contact your LEA if you have any questionsregarding this letter. <br /> Sincerely, <br /> Doug L. Strauch, Chief <br /> Was Management Division <br /> cc: Donna Heran <br /> San Joaquin Local Health District <br />