Laserfiche WebLink
I <br /> NOW <br /> EMCON ASSOCIATES-Sacramento <br /> GROUND WATER SAMPLING AND ANALYSIS REQUEST FORM <br /> PROJECT NAME :Hamey Lane Landfill <br /> SCHEDULED DATE: November 12, 1991 <br /> SPECIAL INSTRUCTIONS/CONSIDERATIONS: Project <br /> Authorisation: P.Grafi <br /> Project No. : 939-01.1 <br /> Call Wes Johnson 1-2 days in advance (209)468-3066 Task Code: <br /> Wells are equipped with dedicated pumps. Send Results To: P.Graham <br /> Well Lock <br /> Number(s) <br /> X CHECK BOX TO AUTHORIZE DATA ENTRY Site Contact: Wes Johnson (209)468-3066 <br /> Name Phone# <br /> Well Number Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES RE®VESTED <br /> inches fee4 feet <br /> FOR ALL WELLS: <br /> MW-1 4.5 150.0 128.0 <br /> MW-2 4.5 143.0 124.3 Total Hardness <br /> MW-3 4.5 145.0 126.1 Chlorides <br /> Chemical Oxygen Demand ' <br /> MW-4 4.5138.0 124.3 TKN <br /> itrate-Nitrogen <br /> "Color(cobalt units) <br /> **Odor <br /> pH"EC <br /> Id Filtered <br /> n <br /> "Field Measurement <br /> Laboratory and Lab OC Instructions <br /> Need Standard 2-week turnaround time. <br /> NOTE: IT IS VERY IMPORTANT TO INCLUDE A COPY OF PROJECT PROPOSAL <br /> AND WELL LOCATION MAP OR SKETCH WITH THIS REQUEST. <br />