My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1990-1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1990-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 5:37:58 PM
Creation date
5/7/2021 8:42:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1990-1991
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br /> Z, COUNTY OF SAN JOAQUIN EUGENEDELUCCHI <br /> DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> P. 0. BOX 1810 - 1810 E. HAZELTON AVENUE THOMAS R. FLINN <br /> ' STOCKTO N. CALIFORNIA 95201 DEPUTY DIRECTOR <br /> I C'9CjFOR�\P (209) 488-3000 MANUEL LOPEZ <br /> DEPUTY DIRECTOR <br /> HENRY M. HIRATA RICHARD C. PAYNE <br /> DIRECTOR DEPUTY DIRECTOR <br /> July 6, 1990 <br /> Kim Schwab <br /> California Integrated Waste Management Board <br /> 1020 Ninth Street, Suite 300 <br /> Sacramento, CA 95814 <br /> CLOSURE PLAN FOR THE HARNEY LANE SANITARY LANDFILL, <br /> SAN JOAQUIN COUNTY. <br /> Dear Kim, <br /> This letter is in response to our telephone conversation concerning <br /> the closure plan you received for the Harney Lane Sanitary <br /> Landfill. As you mentioned, you received a copy of the closure <br /> plan, dated 1986, by Nolte and Associates. This plan was sent to <br /> Leandro Ramos of the Waste Board as an attachment to a compliance <br /> agreement following a state inspection of the landfill. For some <br /> unknown reason the plan was inadvertently routed to you through the <br /> Waste Board. The plan is not a submittal of a final closure plan <br /> for the site. It was prepared for the Regional Water Quality <br /> Control Board in 1986 to comply with Subchapter 15 regulations <br /> regarding closure. <br /> The County Solid Waste Engineering Staff is currently preparing the <br /> final Closure-Postclosure Plan for the Harney Lane Landfill. The <br /> County has the necessary topographic maps and our engineering staff <br /> is preparing the final design, cross section drawings and phasing <br /> diagrams to complete the plans. We have also completed the draft <br /> slope stability analysis and are also preparing the Construction <br /> Quality Assurance Program to accompany the plan report. <br /> We plan to have the completed final Closure-Postclosure Plan ready <br /> for submittal to the Waste Board by September 1, 1990. If you have <br /> any questions or comments, feel free to call me at (209) 468-3066. <br /> S 'ncerely <br /> Rudy Rodriguez <br /> �--. <br /> Assistant Engineer <br /> C: Ed Padilla <br /> Environment Health Officer <br />
The URL can be used to link to this page
Your browser does not support the video tag.