My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1990-1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1990-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 5:37:58 PM
Creation date
5/7/2021 8:42:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1990-1991
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The probes will consist of 1/211 schedule 40 PVC pipe. <br /> Approximately the bottom five feet of each monitoring probe will <br /> consist of a perforated probe tip. Each probe tip will be <br /> surrounded by clean pea gravel. A 5 foot bentonite seal will be <br /> placed between monitoring zones (figure 4) . A 1/811 vinyl tube will <br /> be inserted in each probe and will extend to the beginning of the <br /> perforated probe tip. This vinyl tube will be used to collect <br /> samples. Each well will be equipped with a vault box and locking <br /> cover at the surface. <br /> V. MONITORING AND REPORTING <br /> Monitoring will be performed in accordance with the CIWMB's <br /> regulations for closure and postclosure. Methane will be monitored <br /> monthly for the first six months. The frequency will be reduced <br /> to quarterly after six months and will continue on a quarterly <br /> basis throughout the postclosure period. Monitoring frequency and <br /> parameters being tested may be increased as necessary or as <br /> directed by the Local Enforcement Agency or the CIWMB. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.