Proposed wells MW-27A and MW-28A will be completed in above-ground monuments set in a <br /> concrete pad that are surrounded by bollards. To accommodate operations at the site, wells <br /> MW-25A, MW-26A and MW-29A will be completed with a flush-mounted traffic-rated well box and <br /> the remaining annular space will be backfilled with the concrete for the well pad. All wells will be <br /> secured with a locking cap. The proposed well construction details are shown on Figure 9. <br /> 6.5.1 Well Development <br /> In accordance with the California Well Standards(Department of Water Resources[DWR], 1991), <br /> the wells will be developed a minimum of 48 hours after installation by a combination of bailing, <br /> surging, and pumping. Total well depth, DTW, temperature, pH, specific conductance, dissolved <br /> oxygen, and ORP will be measured prior to the start and periodically during development. <br /> Development will continue until a minimum of five casing volumes of water have been removed <br /> and water quality parameters have stabilized. <br /> 6.5.2 Well Surveying <br /> The location, ground surface elevation, and top of casing elevation will be measured by a <br /> California-licensed Professional Land Surveyor in accordance with the requirements for the State <br /> Water Resources Control Board Geotracker database. <br /> 6.6 Decontamination and Waste Management <br /> Down-hole drilling equipment will be decontaminated prior to drilling each well using high- <br /> pressure cleaning equipment. The decontamination rinsate, well development water, and soil <br /> cuttings generated during drilling will be placed by waste stream into separate 55-gallon United <br /> States Department of Transportation approved drums and labeled, dated, and staged on site prior <br /> to disposal at an appropriate off-site facility. <br /> 7.0 GROUNDWATER MONITORING AND SAMPLING PROGRAM <br /> 7.1 Schedule and Frequency <br /> Baseline groundwater samples will be collected from the designated wells prior to the injection <br /> event. Post-injection samples will be collected monthly for six months and then quarterly for <br /> another year. The pilot test analytical parameters will then be incorporated into the exiting semi- <br /> annual Monitoring and Reporting Program (MRP) for two years. <br /> 7.2 Well Designations <br /> In accordance with RWQCB General Order No. R5-2015-0012, the following wells have been <br /> designated for the pilot test at the north pond. <br /> • Background wells: MW-22A and MW-29A <br /> • Performance monitoring wells: MW-2A, MW-14A, and MW-25A through MW-28A <br /> • Compliance well: MW-8 <br /> CPS Stockton, California 6 / ,� <br /> Pilot Test Work Plan ab& <br />