Laserfiche WebLink
-2- <br /> PA-1800316(UP) <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.(Resolutions R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for any incremental traffic <br /> resulting from this application.The fee is due and payable at the time of building permit <br /> application.The fee will be based o the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 3_ The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more.Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval,prior to release of building permit.(Development Title Section 9-1135) <br /> a. A copy of the Final Site Plan shall he submitted prior to release of building permit. <br /> 5. An encroachment permit shall be required for all work within road right-of-way. (Nate: <br /> Driveway encroachment permits are for flatwork only—all vertical features,including but <br /> not limited to fences,walls,private light standards,rocks,landscaping and cobbles are not <br /> allowed in the right-of-way.)(Development Title Sections 9-1145.4 and 9-1145.5) <br /> G. Prior to issuance of the occupancy permit,the approach for the private drive shall be <br /> improved in accordance with the requirements of San Joaquin County improvement <br /> Standards Drawing No.R-17. (Development Title Section 9-1145.5) <br /> T Permit Registration Documents(P RDs)shall be filed with the State Water Resources <br /> Control Board(SWRCB)to comply with the State"General Permit for Storm Water <br /> Discharges Associated with Construction Activity".The Waste Discharge Identification <br /> Number(WDID)issued by SWRCB,shall be submitted to Public Works for file.Contact <br /> SWRCB at(916)341-5537 for further information.Coverage under the SWRCB General <br /> Construction Permit Order 2009-0009-DWQ shall be maintained throughout the duration of <br /> all phases of the project. <br /> 8. Owner shall check with the State Water Resource Control Board(SWRCB)to determine If <br /> an Industrial Storm Water Permit will be required. <br /> 9. All new construction and the substantial improvements of any structures,including <br /> conversion of existing structures,shall be elevated or floodproofed in accordance to San <br /> Joaquin County ordinance Code Section 9-1605.12(a)b,(b)and(c), <br /> JR:CH <br /> Planning Commission Staff Report, PA-1800316(UP) 6 <br /> Response Letters <br />