My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
14001
>
2800 - Aboveground Petroleum Storage Program
>
PR0518071
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2021 4:26:05 PM
Creation date
5/18/2021 4:19:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518071
PE
2831
FACILITY_ID
FA0003163
FACILITY_NAME
WIMPYS MARINA CAFE
STREET_NUMBER
14001
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
WALNUT GROVE
Zip
95690
APN
00104002
CURRENT_STATUS
01
SITE_LOCATION
14001 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
112.6(a)(3)(i) Plan includes a prediction of the direction and total quantity of oil which could be discharged <br /> from the facility as a result of each type of major equipment failure if there is a reasonable ❑ Yes❑No El NA <br /> potential for equipment failure (such as loading or unloading equipment,tank overflow, <br /> rupture, or leakage, or any other equipment known to be a source of discharge) <br /> (ii) Bulk storage container installations(except mobile refuelers and other non-transportation- <br /> related tank trucks), including mobile or portable oil storage containers, are constructed to ❑ Yes❑No ❑' NA <br /> provide secondary containment for the entire capacity of the largest single container plus <br /> additional capacity to contain precipitation, and <br /> Mobile or portable oil storage containers positioned or located to prevent a§112.1(b) ❑ Yes❑No❑NA <br /> discharge <br /> (iii) Plan describes a system or documented procedure to prevent overfills for each container E] ❑Yes No❑NA <br /> and is regularly tested to ensure proper operation or efficacy <br /> Comments: <br /> GENERAL SPCC REQUIREMENTS-40 CFR 112.7 PLAN FIELD <br /> Management approval at a level of authority to commit the necessary resources to ❑ Yes D No <br /> fully implement the Plan? <br /> Plan follows sequence of the rule or is an equivalent Plan meeting all applicable ❑ Yes Q No D NA <br /> rule requirements and includes a cross-reference of provisions <br /> If Plan calls for facilities, procedures, methods, or equipment not yet fully <br /> operational, details of their installation and start-up are discussed (Note:Relevant ❑ Yes El No El NA <br /> for inspection evaluation and testing baselines.) <br /> 112.7(a)(3) Plan addresses each of the following: <br /> (i) For each fixed container,type of oil and storage capacity(see ❑ Yes ❑No Dyes [7]No <br /> Attachment C of this checklist). For mobile or portable containers, <br /> type of oil and storage capacity for each container or an estimate <br /> of the potential number of mobile or portable containers, the types <br /> of oil, and anticipated storage capacities <br /> (iv) Countermeasures for discharge discovery, response, and cleanup ❑ Yes❑No Dyes ❑No <br /> (both facility's and contractor's resources) <br /> (vi) Contact list and phone numbers for the facility response ❑ Yes❑No <br /> coordinator, National Response Center, cleanup contractors with <br /> an agreement for response, and all Federal, State, and local <br /> agencies who must be contacted in the case of a discharge as <br /> described in §112.1(b) <br /> 112.7(a)(4) Plan includes information and procedures that enable a person ❑Yes ❑No ❑' NA <br /> reporting an oil discharge as described in§112.1(b)to relate <br /> information on the: <br /> • Exact address or location and phone • A description of all affected media; <br /> number of the facility; • Cause of the discharge; <br /> • Date and time of the discharge; • Damages or injuries caused by the <br /> • Type of material discharged; discharge; <br /> • Estimates of the total quantity discharged; • Actions being used to stop,remove,and <br /> • Estimates of the quantity discharged as mitigate the effects of the discharge; <br /> described in§112.1(b); • Whether an evacuation may be needed; <br /> • Source of the discharge; • Names of individuals and/or organizations <br /> who have also been contacted <br /> 112.7(a)(5) Plan organized so that portions describing procedures to be used ❑ Yes ❑No 0 NA <br /> when a discharge occurs will be readily usable in an emergency <br /> Comments: <br /> May be part of the Plan or demonstrated elsewhere. <br /> Tier 1 Qualified Facilities Page 6 of 8 June 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.