Laserfiche WebLink
PLAN FIELD <br /> 112.7(c) Appropriate containment and/or diversionary structures or equipment are provided to prevent a discharge as <br /> described in§112.1(b), except as provided in§112.7(k)of this section for certain qualified operational <br /> equipment and§112.9(d)(3)for certain flowlines and intra-facility gathering lines at an oil production facility. <br /> The entire containment system, including walls and floors, are capable of containing oil and are constructed to prevent <br /> escape of a discharge from the containment system before cleanup occurs.The method, design,and capacity for <br /> secondary containment address the typical failure mode and the most likely quantity of oil that would be discharged. <br /> See Attachment C of this checklist. <br /> For onshore facilities, one of the following or its equivalent: <br /> • Dikes,berms,or retaining walls sufficiently • Weirs,booms or other barriers, <br /> impervious to contain oil, . Spill diversion ponds, <br /> • Curbing or drip pans, . Retention ponds,or <br /> • Sumps and collection systems, • Sorbent materials <br /> • Culverting,gutters or other drainage systems, <br /> Identify which of the following are present at the facility and if appropriate containment and/or diversionary structures <br /> or equipment are provided as described above: <br /> 0 Bulk storage containers ❑ Yes❑No❑NA 0 Yes ❑No❑NA <br /> Mobile/portable containers ❑ Yes ❑No❑NA ❑ Yes❑No❑NA <br /> []Oil-filled operational equipment as defined in 112.2 ❑ Yes❑No❑NA ❑ Yes❑No 0 NA <br /> []Other oil-filled equipment i.e., manufacturing equipment) ❑ Yes❑No ❑NA ❑ Yes❑No 0 NA <br /> ElPiping and related appurtenances ❑ Yes❑No ❑NA ❑ Yes 0 No❑NA <br /> []Mobile refuelers or non-transportation-related tank cars ❑ Yes❑No❑NA ❑ Yes ❑No 0 NA <br /> OTransfer areas, equipment and activities ❑ Yes ❑No❑NA ❑ Yes ❑� No[-I NA <br /> [:]Identify any other equipment or activities that are not listed ❑ Yes E)No❑NA [I Yes❑No DNA <br /> above: <br /> 112.7(e) Inspections and tests conducted in accordance with written ❑ Yes ❑No ❑ Yes Q No <br /> procedures <br /> Record of inspections or tests signed by supervisor or inspector ❑ Yes ❑No ❑ Yes❑ No <br /> Kept with Plan for at least 3 years(see Attachment D of this ❑ Yes ❑No ❑ Yes❑ No <br /> checklist)$ <br /> 112.7(f) Personnel,training, and oil discharge prevention procedures <br /> (1) Training of oil-handling personnel in operation and maintenance of ❑ Yes ❑No❑NA ❑ Yes❑No❑I NA <br /> equipment to prevent discharges;discharge procedure protocols; <br /> applicable pollution control laws, rules, and regulations;general <br /> facility operations; and contents of SPCC Plan <br /> (2) Person designated as accountable for discharge prevention at the ❑ Yes ❑No❑NA ❑ Yes❑No❑NA <br /> facility and reports to facility management <br /> (3) Discharge prevention briefings conducted at least once a year for ❑ Yes❑No❑NA ❑ Yes[:]'No❑NA <br /> oil handling personnel to assure adequate understanding of the <br /> Plan. Briefings highlight and describe known discharges as <br /> described in§112.1(b)or failures, malfunctioning components, <br /> and any recently developed precautionary measures <br /> Comments: <br /> 112.7(c)-TANK IS DOUBLE WALLED, BUT NO PASSIVE MEASURES SEEM FOR PIPING OR TRANSFER AREA <br /> CONTAINMENT. ACTIVE CONTAINMENT MEASURES (SPILL KIT) NOT AVAILABLE NEAR PIPING/TRANSFER <br /> AREA. <br /> e Records of inspections and tests kept under usual and customary business practices will suffice <br /> Tier/Qualified Facilities Page 7 of 8 June 2014 <br />