My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REMEDIAL ACTION DOCUMENT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILLOW GLEN
>
13751
>
2900 - Site Mitigation Program
>
PR0009025
>
ARCHIVED REPORTS_REMEDIAL ACTION DOCUMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 2:55:48 PM
Creation date
5/19/2021 12:15:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REMEDIAL ACTION DOCUMENT
RECORD_ID
PR0009025
PE
2960
FACILITY_ID
FA0004055
FACILITY_NAME
LATHROP GAS DEHYDRATOR
STREET_NUMBER
13751
Direction
S
STREET_NAME
WILLOW GLEN
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
19105010
CURRENT_STATUS
01
SITE_LOCATION
13751 S WILLOW GLEN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 Field Activities <br /> 3.1 Summary of Field Activities <br /> Remedial activities at the Site were conducted from February 2,2004 through April 26,2004. <br /> The general chronology of field activities is as follows: <br /> • Abandonment of wells MW-1,MW-9,and MW-10: August 28,2003 and February 13, <br /> 2004 <br /> • Site preparation,removal of production equipment(production fluids tank and <br /> contactor tower),demolition of concrete pads and Site cleanup: February 2-February <br /> 20,2004 <br /> • Pre-disposal soil sampling for landfill acceptance: February 3 and February 13,2004 <br /> • Soil sampling associated with demolition activities: February 5-April 19,2004 <br /> • Excavation,verification sampling and soil disposal:April 12-April 19,2004 <br /> • Backfill and compaction completion,soil compaction testing and Site restoration:April <br /> 19- April 26,2004 <br /> All activities at the Site were conducted in accordance with the site-specific health and <br /> safety plan,and Site personnel were informed of protocols during daily pre-construction <br /> safety briefings.Photographs were taken during field activities (see selected photographs in <br /> Appendix B). <br /> Prior to commencement of field work,appropriate permits were obtained from the <br /> regulating government agencies.Well Destruction Permits were obtained from the San <br /> Joaquin County Environmental Health Department for the abandonment of wells MW-1, <br /> MW-9,and MW-10.A Grading Permit was obtained from the San Joaquin County <br /> Community Development Department(Permit No. BP-0303801).Copies of the permits are <br /> included in Appendix A. Prior to commencing soil removal work,a letter of notification of <br /> excavation activities was sent to the California Occupational Safety and Health <br /> Administration.Underground Service Alert(USA)was notified 48 hours prior to field <br /> activities. The Valley Air Quality Management District was notified by phone 30 days prior <br /> to the start of planned construction activities. <br /> 3.2 Monitoring Well Abandonment <br /> Monitoring wells MW-1,MW-9,and MW-10 were abandoned on August 28,2003 in <br /> compliance with the San Joaquin County permit and requirements. MW-1 and MW-9 were <br /> overdrilled,as planned,to their maximum depths of 20.5 feet and 19.6 feet below ground <br /> surface (bgs),respectively;they were then grouted to within three feet of the surface and <br /> backfilled to the ground surface with native material. MW-10 was Iocated approximately 4 <br /> SFOILATHROPCOMPLETIONREPORT_12-1-04.DOC 4 <br />