Laserfiche WebLink
REMEDIATION COMPLETION REPORT-BUNKER FIELD DEHYDRATOR STATION 2.0 BACKGROUND <br /> Subcontractors to CCI for the performance of the remedial work included the following: <br /> • KTR-Northstar Construction- excavating and grading <br /> • DenBeste Transportation, Inc.- transporting excavated soil to Forward Landfill and <br /> Chemical Waste Management, Inc. <br /> • National Fence and Bailey Fencing-removing and installing fencing around Site <br /> • California Laboratory Services-performing analytical testing for soil waste disposal <br /> profiling <br /> • Mobile Chem Lab- performing on-site field analyses for soil samples <br /> • Kleinfelder, Inc. -performing field density testing of excavation backfill <br /> SFOILATHROPCOMPLETIONREPORT 12-1-04.DOC 3 <br />