Laserfiche WebLink
4.0 Conclusions <br /> The remedial activities were successful in removing TPH-containing soil in areas of the <br /> former sump and reboiler along the eastern extent of the Site and the former production <br /> fluids tanks along the southern side of the station.Excavation and removal of soil <br /> containing TPH was carried out to the extent feasible, given constraints of active equipment <br /> and underground utilities.Former Site equipment has also been removed,and therefore <br /> there are no potential sources from station activities remaining at the Site to cause future <br /> releases of petroleum hydrocarbons. <br /> Groundwater monitoring of remaining wells will continue to evaluate the effectiveness of <br /> the remedial action on groundwater quality and determine whether the Site remediation is <br /> complete and no further action is appropriate, or if additional characterization or <br /> remediation measures are warranted. <br /> SFOILATHROPCOMPLETIONREPORT 12-1-04.DOC 11 <br />