Laserfiche WebLink
REMEDIATION COMPLETION REPORT-LATHROP DEHYDRATOR STATION 3.0 FIELD ACTIVITIES <br /> 3.9 Groundwater Monitoring System <br /> As discussed with the CVRWQCB, groundwater monitoring will continue at the Site to <br /> determine the effectiveness of the remedial activity. Petroleum hydrocarbons and BTEX in <br /> the groundwater will be monitored and results will be reported on a quarterly basis as part <br /> of the existing CVRWQCB Monitoring and Reporting Program(No.5-01-860)for the Site. <br /> On-site wells MW-7 and MW-8 will be monitored along with off-site wells MW-3 and MW- <br /> 11A. Because these wells surround the excavation area,no replacement wells for MW-1, <br /> MW-9,and MW-10 are necessary. <br /> SFOILATHROPCOMPLETIONREPORT 12-1.04.DOC 10 <br />