Laserfiche WebLink
CH21Vl HILL <br /> 155 Grand Avenue <br /> Suite 1000 <br /> H2M H I 1L L Oakland,CA <br /> Constructors, Inc. 94612 <br /> P.O.Box 12681 <br /> Oakland,CA 94604-2681 <br /> September 23,2003 Tel 510.251.2426 <br /> Fax 510.893.8205 <br /> San Joaquin County Environmental Health <br /> Attention: Jeffrey Wong <br /> 304 E.Weber,3rd Floor <br /> Stockton,CA 95202 <br /> Re: Transmittal of the PG&E Latlirop Dehydrator Station Remedial Action Document--for Issuing of <br /> Public Notice <br /> Dear Mr.Wong: <br /> I appreciate speaking on the phone with you today. Please find enclosed a copy of the <br /> Remedial Action Document for PG&E's Lathrop Dehydrator Station,at 5441 W.Undine Road <br /> just outside of Lathrop,in San Joaquin County,California (APN# 191-050-10). As discussed in <br /> our phone conversation and included in the Remedial Action Document,excavation at the <br /> Lathrop Station is proposed to remediate soil to a depth of 11 to 12 feet below ground surface <br /> (bgs).We anticipate this project will begin in the field on or about October 20,2.0-02 gnd should <br /> take approximately one month to complete. If we see any major changes forthcoming in the <br /> schedule,we will advise you in advance. <br /> This construction is being performed voluntarily by PG&E under the authority and with the <br /> agreement of the Central Valley Regional Water Quality Control Board (CVRWQCB). Please <br /> contact me at(916) 286-0234,should you have any questions or require additional information <br /> for issuing your Public Notice. <br /> Sincerely, <br /> CH2M HILI Constructors,Inc. <br /> C" <br /> Robert W. <br /> Project anager <br /> cc: Bryan Nicholson/PG&E <br /> Diane Sarmiento/CH2M Hill <br /> Enclosures (Remedial Action Document dated May 2003: one copy) <br />