Laserfiche WebLink
• 1 <br /> Geofogical?echnics Inc. Page 4 <br /> U.S.Can Company <br /> Work Plan-Appendix A <br /> Project No.397.2 <br /> August 9, 1996 <br /> 2.10 Monitoring Well Development <br /> Within 48 hours of well installation after well sealing materials have had time to set, each monitoring well will <br /> be developed by mechanical surging and pumping until a clear stream is obtained. All down hole equipment <br /> will be decontaminated before and between uses. Development water will be removed from the well using <br /> either a bailer or a submersible pump and containerized in D.O.T. approved drums (labeled contents under <br /> analysis)to await proper disposition. After development the wells will be allowed to stabilize before they are <br /> purged and sampled <br />