My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
448
>
2900 - Site Mitigation Program
>
PR0009038
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 6:01:31 PM
Creation date
5/20/2021 2:19:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0009038
PE
2960
FACILITY_ID
FA0004035
FACILITY_NAME
STOCKTON REDEVELOPMENT AGENCY
STREET_NUMBER
448
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13726005
CURRENT_STATUS
02
SITE_LOCATION
448 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1874
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 7 <br /> Dual Phase Extraction System-Operating Data <br /> Parcel 2A-L&M OU <br /> 666 West Weber Avenue,Stockton,CA <br /> Period Influent Effluent <br /> Hourmeter Totalizer System Volume Average FIN Well Field Operating System ■ Flow VOC VOC VOC1 <br /> Reading Reading Flow Discharged Flow Rate Rate Temperature Temperature Vacuum Rate [FID] [FID] Removed <br /> Date hours al al al al/da m °F °F inH scfm my my Ib/da H12 Notes <br /> Notes continue : <br /> 7=Source test for air board. System shut down following source test due to on-site excavation activities. <br /> 8=Samples collected from wastewater treatment system.Carbon change-out needed. <br /> 9=System shut down following completion of vapor PAH sample collection. <br /> 10=System non-operational since 5/2005.No sampling and no discharge activities occurred. <br /> 11 =System effluent sampled on 7/6/2005 following startup. <br /> 12=Start-up on fresh GAC <br /> 13=pH measurement recorded in the field beginning December 9,2009. <br /> 14=Hourmeter and totalizer readings recorded on Feb 4,2010,all else occurred on Feb 5,2010. <br /> 15=System shutdown on August 28,2010 due to the failure of the oil-water separator transfer pump. Repairs were made and the system was restarted on October 4,2010. <br /> 16=System hour meter was replaced. DPE wells were closed during pilot test conducted from 11/16/10 to 11/19/10. Nowell field temperature or flow rate were collected;therefore,values from the most recent visit with the same system <br /> vacuum was used instead(07/12/10). <br /> 17=System shut down with regulatory approval for remainder of 4Q11 due to declining influent concentrations. Will be restarted following rebound testing. <br /> 18=System restarted <br /> 19=System measurements not collected on this date. <br /> 20=System measurements taken post blower on and after this date.System Vacuum now System Pressure in units of'in H 20' <br /> I:\Tidewater\TW Stockton(P2A)\Engineering\O&M\Tables\O&M Tables 2012\4Q12\Parcel 2A OM Tables 4Q12.xlsx Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.