My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 4:12:26 PM
Creation date
5/20/2021 3:19:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> 4.0 SCHEDULE <br /> Pre-field activities will commence immediately upon RWQCB approval of the Work Plan. <br /> Completion of Task 1 and the mobilization of the driller are anticipated within approximately <br /> three weeks of receiving Work Plan approval; contingent upon timely receipt of permits and <br /> access agreements, and the drilling subcontractor's availability. It is anticipated that field <br /> activities for Tasks 2 and 3 will take approximately one to two weeks. The Site Investigation <br /> Report will be generated within approximately six weeks of completion of field activities and <br /> receipt of laboratory analytical reports. <br /> William DePaoli Property 7 of 7 <br /> Additional Groundwater Investigation Work Plan <br /> June 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.