Laserfiche WebLink
Former Vernalis Pump Station - 2- 19 March 2004 <br /> Bellini and Arcos Properties <br /> Vernalis, San Joaquin Co. <br /> o A separate plan and time schedule needs to be submitted for an investigation to address <br /> additional lateral soil and groundwater delineation for both properties. <br /> By 1 July 2004, please provide a plan and time schedule for: a) delineating the lateral extent of soil and <br /> groundwater impacts downgradient (offsite) and for delineating impacted soil and groundwater in the <br /> northwest portion of the Bellini property, and, b) delineating the lateral extent of impacted soil and <br /> groundwater at the Arcos property, including offsite. <br /> If you have any questions or comments, please contact Dean Hubbard at (559) 445-5179. <br /> r� <br /> SHELTON R. GRAY C. DEAN HUBBARD <br /> Senior Engineering Geologist Associate Engineering Geologist <br /> RG No.6357 <br /> CDH: cdh <br /> Enclosures <br /> cc: Mr. Michael Infurna, Jr., San Joaquin County PHS, Stockton <br /> Mr. James Simpson, Stanislaus County Department of Environmental Resources, Modesto <br /> Mr. and Mrs. Arnold Bellini, Tracy <br /> Mr. Rosalio Arcos, Oakdale <br /> Mr. Luis Mercado, SAIC, Sacramento <br /> s;l <br />