My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:39:55 AM
Creation date
5/25/2021 11:23:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.04 ABANDONED BORINGS <br /> A. The Contractor shall alert the Engineer if an obstruction is reached during <br /> drilling such that the well cannot be completed in accordance with the <br /> construction drawings. <br /> B. The Engineer will determine whether the borehole has reached a sufficient <br /> depth for its intended function. If the borehole is not to the design depth, <br /> then the Engineer may direct the Contractor to abandon the borehole. <br /> C. Backfill abandoned borings in native soil with neat cement. The Contractor <br /> shall tremie neat cement in the abandoned boring <br /> D. Backfill abandoned boring in refuse with soil. <br /> E. The Engineer will direct the Contractor to a new well location. <br /> 3.05 WELL INSTALLATION <br /> The Contractor shall coordinate well inspections with EHD inspector. <br /> The Contractor shall re-drill any borehole that caves in during well <br /> installation at no additional cost to the County. <br /> A. Backfilling <br /> 1. The Contractor shall measure the depth of the bore hole in the <br /> presence of the Engineer before backfilling. <br /> 2. Remove any organic materials from the drain rock backfill. <br /> 3. The Contractor shall maintain the well pipe vertical <br /> 4. Place backfill materials in a controlled manner to avoid bridging or <br /> overfilling the boring, or damaging the well pipe. <br /> 5. Bentonite plugs shall be hydrated in the borehole with five gallons of <br /> water. Wait one hour before adding neat cement on top of the <br /> bentonite plug. <br /> 6. The Contractor shall tremie neat cement in the borehole. <br /> Construction Specifications San Joaquin County <br /> LFG Extraction Wells Public Works Department <br /> Harney Lane Sanitary Landfill 8 Solid Waste Division <br /> 10-30-09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.