Laserfiche WebLink
a <br /> B. Payment <br /> 1. Payment for abandoned boring backfill in refuse and native soil shall <br /> be by the unit price per linear foot quoted in the cost sheet. <br /> 2. Payment for abandoned boring backfill in native soil shall be by the <br /> unit price per linear foot quoted in the cost sheet. <br /> 3. The unit price quoted for each backfill section shall include full <br /> compensation for furnishing all labor, tools, equipment for drilling, <br /> backfilling the borehole as shown on the construction drawings, final <br /> grade restoration and hauling refuse and soil mixed with refuse off <br /> site. <br /> PART 5 DEFINITIONS AND TERMS <br /> 5.01 DEFINITIONS <br /> County —County shall mean the County of San Joaquin, Department of <br /> Public Works, Solid Waste Division <br /> Engineer- Shall mean Staff Engineer of San Joaquin County, Department <br /> of Public Works, Solid Waste Division. <br /> EHD- Shall mean San Joaquin County Environmental Health Department <br /> END OF SECTION <br /> Construction Specifications San Joaquin County <br /> LFG Extraction Wells Public Works Department <br /> Harney Lane Sanitary Landfill 13 Solid Waste Division <br /> 10-30-09 <br />