My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODWARD
>
9909
>
2900 - Site Mitigation Program
>
PR0508168
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 1:00:21 PM
Creation date
5/26/2021 10:27:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508168
PE
2950
FACILITY_ID
FA0007971
FACILITY_NAME
KARLSON TRUCKING (FORMER)
STREET_NUMBER
9909
Direction
E
STREET_NAME
WOODWARD
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
9909 E WOODWARD AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IIA Environmentai bite Assessment Page 2 <br /> Former Karlson Trucking Property <br /> Project No. 191.2 <br /> October 28, 1998 <br /> • A former retention pond which stored water sourced from a former truck <br /> wash. <br /> • A soil stockpile possibly containing oil impacted soil sourced from the truck <br /> washing operation. <br /> • An area of soil staining underneath the pole barn building formerly used for <br /> equipment storage. <br /> 2.0 FIELD DATA COLLECTION PROCEDURES <br /> 2.1 Hand Auger Soil Borings <br /> Hand auger soil borings were completed in three areas of the site and advanced <br /> using a 3.25" O.D. soil recovery auger. Soil samples were collected in a 2" <br /> diameter brass liner placed in a 6" long slide hammer driven sampler. Upon <br /> reaching total depth in each boring, a final soil sample was collected and then <br /> each boring which was completed to a depth greater than three feet below grade <br /> was filled with cement grout. <br /> The soil sample collection procedures for all of the soil samples collected are <br /> described in Section 2.3, the site's geologic conditions are discussed in Section <br /> 3.1. and analytical results are included in Section 3.2. <br /> 2.1.1 Stockpile Soil Sampling <br /> A large soil stockpile located on the western side of the Property was sampled on <br /> October 8, 1998. A total of twenty shallow soil borings were completed into the <br /> stockpile at the site, each to a total depth of three feet below ground surface. <br /> Soil samples were collected from the base of each of these borings (see site map <br /> for boring locations and section 3.0 for field observations and analytical data). <br /> 2.1.2 Shallow Soil Sampling-Pole Barn <br /> On October 9, 1998 a total of ten shallow soil samples were collected through the <br /> floor of the pole barn at the site. Hand augered soil borings were completed to a <br /> total depth of six feet below grade in this area. Soil samples were collected from <br /> the two and six foot intervals in each of these borings (see site map for boring <br /> locations and section 3.0 for field observations and analytical data). <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.