My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODWARD
>
9909
>
2900 - Site Mitigation Program
>
PR0508168
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 1:00:21 PM
Creation date
5/26/2021 10:27:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508168
PE
2950
FACILITY_ID
FA0007971
FACILITY_NAME
KARLSON TRUCKING (FORMER)
STREET_NUMBER
9909
Direction
E
STREET_NAME
WOODWARD
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
9909 E WOODWARD AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Characterization- Second Event Page 3 <br /> Former Karlson Trucking Facility <br /> Project No. 191.2 <br /> April 27, 2000 <br /> hydrocarbon impact and one to 30 feet below ground surface in the <br /> vicinity of MW-4 to define the vertical extent of hydrocarbon impact to <br /> groundwater. Groundwater samples would be collected from each of these <br /> borings with four groundwater samples collected from SB-10 at depths of <br /> 14, 19, 24 and 28 feet below grade. <br /> 2. Upon completion of the Geo-Probe soil borings, two monitoring wells were <br /> to be installed. The work plan called for one well to be located to the <br /> southeast of MW-3 to bound the southern margin of the contaminant <br /> plume, and one well was to be located in the down-gradient direction from <br /> the point of release. Based on the results of the Geo-Probe borings, and at <br /> the suggestion of RWQCB staff, this plan was changed so that both wells <br /> were located in the down-gradient direction from MW-4. <br /> 2.1.1 Geo-Probe Boring Installation <br /> A total of five Geo-Probe borings were installed on January 26, 2000. These <br /> consisted of the following: <br /> • SB-8 and 9 in down-gradient direction from the suspected point of release, <br /> these borings were to be installed to 20 feet below grade <br /> • SB-10 adjacent to MW-4, to be installed to 30 feet below grade, and <br /> • SB-11 and 12 south of the suspected point of release to be installed 20 feet <br /> below grade. <br /> These borings were drilled using a 1.5" outside diameter Geo-Probe direct <br /> push drilling machine owned and operated by V & W Drilling Inc., of Rio <br /> Vista, CA (License #720904). Soil samples were collected for geological and <br /> analytical evaluation at five foot intervals using a 1.5 inch diameter by 2 foot <br /> long core sampling device fitted with a 1.5" by 2 foot long plastic liners. Upon <br /> completion of each boring, the boring was backfilled with tremied cement <br /> grout. <br /> 2.1.2 Hollow Stem Auger Soil Borings <br /> Two hollow stem auger soil borings were installed into groundwater to a total <br /> depth of approximately 20 feet below grade. Groundwater was encountered <br /> at approximately about 8 to 9 feet below grade. These borings were located <br /> as follows: <br /> • MW-6, due north of the western edge of the pole barn building. The <br /> location of this boring was adjusted approximately 8 feet south due to the <br /> 2937 Veneman Avenue, Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto, Ca 95356 Fax: (209)569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.