Laserfiche WebLink
Work Plan—Soil Boring Installation Page 2 <br /> Russell Property <br /> Project 191.2 <br /> December 13,2000 <br /> Work completed to date has defined the vertical extent of the diesel contamination, but the <br /> lateral extent still in not completely defined. In a letter dated November 20, 2000, the <br /> RWQCB staff directed that additional groundwater samples be collected at two soil boring <br /> sites. These samples are to be collected by the use of Geo-Probe soil boring equipment. This <br /> Work Plan has been prepared pursuant to the directive. <br /> 2937 Veneman Avenue,Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto,Ca 95356 Fax: (209)569-0295 <br />