Work Plan—Soil Boring Installation Page 6 <br /> Russell Property <br /> Project 191.2 <br /> December 13,2000 <br /> 3.0 REPORTING & TIME SCHEDULE <br /> The information gathered during this phase of work will be presented in a report, which will <br /> include a description of the field work, results of sample analyses, and their implications. <br /> The report will be prepared and signed by a registered geologist responsible for the work. <br /> The following summarizes the time schedule for the proposed work: <br /> Date Work to be Performed <br /> Week of Jan 8,2001 Receive Work Plan Approval/Prepare Well Permits& Schedule Drilling. <br /> Week of Jan 22,2001 Complete Drilling-Geo-Probe Soil Borings. <br /> Week of Jan 29,2001 Obtain Soil and Groundwater Data <br /> Week of February 12, Complete soil boring installation report. Evaluate work completed to date to <br /> 2001 determine appropriate future course of action. <br /> 2937 Veneman Avenue,Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto,Ca 95356 Fax: (209)569-0295 <br />