My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODWARD
>
9909
>
2900 - Site Mitigation Program
>
PR0508168
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 1:05:32 PM
Creation date
5/26/2021 10:33:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508168
PE
2950
FACILITY_ID
FA0007971
FACILITY_NAME
KARLSON TRUCKING (FORMER)
STREET_NUMBER
9909
Direction
E
STREET_NAME
WOODWARD
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
9909 E WOODWARD AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan-Monitoring Well Abandonment Page 2 <br /> Former Karlson Trucking <br /> Project No. 191.2 <br /> 2 July 2002 <br /> 2.2 Pressure Grouting <br /> The RWQCB staff have agreed that pressure grouting is an acceptable <br /> method of well abanodonment, and the wells will be so abandoned. This <br /> work will be performed by V&W Drilling (C-57 # 720904). The following <br /> steps task will be performed to complete the well abandonment. <br /> The locks and caps will be removed from each well. <br /> V&W Drilling personnel will prepare Class G neat cement for use as grout in <br /> pressure grouting the wells. <br /> Each well will be sequentially fitted with a 2 inch pressure cap. Neat cement <br /> was then pumped into each well using a pneumatically actuated cement <br /> pump. Pumping will continued until a positive pressure of at least 5 pounds <br /> per square inch is reached at each well head. The volume of grout pumped <br /> will be monitored to verify that the casing is full and the grout gas squeezed <br /> through the slots and into the gravel pack. <br /> 2.3 Finish Work <br /> After each well is grouted, the casing will cut off below grade and the <br /> remaining hole around each well head will be brought up to grade with <br /> native soil. <br /> 3.0 REPORTING <br /> A brief report documenting the well abandonment will be prepared. Copies <br /> will be distributed to Mrs. Russell, the RWQCB, and the San Joaquin County <br /> PHS-EHD. <br /> 2937 Veneman Avenue, Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto, Ca 95356 Fax: (209)569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.