Laserfiche WebLink
Otroy <br /> Sampling and Abandonment Requirements <br /> 1. Continuous core soil sampling Geoprobe Macro Core system. <br /> ?. Discrete oroundiiater sampling Geoprobe Screen Point 15 system. <br /> 3. Concrete coring Geoprobe Drill Still;Dimond Core drilling available as needed <br /> 4. Dccontamiamion Three bucket rise with liquin=steam cleaner utilized as needed <br /> Grouting procedures In accordance w/San Joaquin County Public Health Services Well Standards <br /> "Well Grouting and Construction"Section 4.7(t.remmie grout) <br /> 6. Surface patching Asphalt or concrete <br /> 7 Sampling Equipment Geoprobe Models 6600,5410/5410 <br /> Vironex Limited Access Badger and Bobcat DPT <br />