Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> 87 91 dsl <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping Yes r. Yes r. Yes r Yes <br /> secondarily contained? r No No No No <br /> OPE Model oPw oPw oPw <br /> Shut off Shut off V Shut off Shut off <br /> Flow Flow Flow Flow <br /> Restricts ! Restricts ! Restricts ! Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) Audible ' Audible ' Audible ' Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual ! Visual ! Visual ! Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? No No No r No <br /> At what level in the tank is the OPE set to 99.625 100.625 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 91.4 90.8 <br /> Is the OPE in proper operating condition to Yes Yes Yes r Yes <br /> respond when the stored substance reaches No No No No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> r Pass Pass Pass r Pass <br /> OPE Inspection Results r: Fail c Fail Fail r Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> WAS NOT ABLE TO TEST REG. DO TO THE NIPPLE NOT BEING ABLE TO BE REMOVED. <br /> *Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />