Laserfiche WebLink
Overfill Prevention Equipment Inspection <br /> .114 Tanknology OPW 61 and 71 Series Overfill Prevention Device Inspection <br /> Date: 6/16/2021 <br /> Customer Name: CHEVRON PRODUCTS USA <br /> Location#: Chevron 212470 <br /> Location Address: 3400 N MacArthur Drive ,Tracy,CA,95376 <br /> DPW Model Number: 71 SO <br /> 87 91 dsl <br /> PART 1)Proper height setting calculation <br /> Maximum Tank Volume per:Tank Chart Agallons 19703.000 11849.000 7817.000 <br /> Max shut off requirement for Flapper is 95% B95i 0.95 0.95 0.95 0.95 <br /> Multiply Maximum tank volume by 95% C gallons 18717.850 11256.550 7426.150 <br /> Use tank chart to determine height of calculated volume D inches 104.875 106.500 <br /> Measure top of fill riser threads,or face seal adapter when used,to tank top E inches 28.500 34.250 <br /> Tank diameter From Chart F inches 117.750 118.125 <br /> Upper Tube in tank(G) F-D=G G inches 12.875 11.625 <br /> Subtract 2 inches from upper tube in tank G-2"=H H inches 10.875 9.625 <br /> Calculated minimum upper tube length (1)H+E=I Iinches 39.375 43.875 <br /> Actual measured upper tube length (Without fill Jinches 44.625 49.750 <br /> adapter)(J) <br /> PART 2)Device certification criteria evaluation <br /> Criteria 1 Yes Yes <br /> Does the overfill prevention device meet the 95%requirement? <br /> Criteria 1 a If the final shutoff volume is installed greater than 95%, is there at <br /> least 250 gallons of ullage above the overfill device activation point NA NA <br /> to ensure that none of the tank top fittings are exposed to product, <br /> meeting the criteria established in EPA 280.20iic and per OPW <br /> installation guidelines. <br /> Criteria 2 Is the Actual measured upper tube length 6.5 inches Yes Yes <br /> or more than the fill riser?(J must be 6.5"or more <br /> than E) <br /> Criteria 3 Does the overfill prevention device function as <br /> required?(Inspect the device for damage, NA-seized Yes Yes <br /> contamination,freedom of movement, <br /> weakening due to wear and corrosion) <br /> PART 3)Device Certification PASS/FAIL <br /> NA-seized Pass Pass <br /> Technician certifies that the device is operationally <br /> compliant. <br /> Comments: <br /> WAS NOT ABLE TO TEST REG. DROPTUBE WAS NOT ABLE TO REMOVE THE NIPPLE. <br /> Signature of Technician: Date: <br /> 6/16/2021 <br /> Jesus Saldivar <br /> WO: NW1-2350423 <br />