My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
2096
>
2900 - Site Mitigation Program
>
PR0522097
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 1:37:56 AM
Creation date
5/26/2021 4:05:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522097
PE
2960
FACILITY_ID
FA0015058
FACILITY_NAME
SCHMIEDT SOIL SERVICE
STREET_NUMBER
2096
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22404021
CURRENT_STATUS
01
SITE_LOCATION
2096 S MAIN ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k9l KLEINFELDER <br /> 6 ANTICIPATED SCHEDULE <br /> This scope of work and its assumptions and limitations are based on the following schedule: <br /> Anticipated Schedule <br /> (Business Da s) Task <br /> 3 —5 days Submittal of Revised Workplan to RWQCB <br /> 5 — 10 days RWQCB review and comment <br /> 7 - 10 days Contracting of Kleinfelder <br /> 5 — 10 days Revisions and RWQCB approval of final Revised Workplan <br /> 5 — 10 days Permitting and subcontractor scheduling* <br /> 3 —5 days Monitoring well installation and development <br /> 1 day Monitoring well sampling <br /> 21 days Laboratory analysis <br /> 10— 15 days Report preparation and submittal to Ms. Schmiedt <br /> 3 days Submittal of Limited Soil and Groundwater Investigation <br /> Monitoring Well Installation Report to RWQCB by Ms. Schmiedt <br /> * Kleinfelder has no control over the time required by a regulatory agency to review and approve a Revised <br /> Workplan and permit applications. <br /> Based on the above table, total time anticipated to complete the described scope of work is 18 <br /> weeks (4%i months) including field work, chemical analysis, surveying and report preparation. <br /> 27125/01 /STO3R657 Page 12 of 15 <br /> Copyright 2003,Kleinfelder,Inc. May 23,2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.