k9l KLEINFELDER <br /> 6 ANTICIPATED SCHEDULE <br /> This scope of work and its assumptions and limitations are based on the following schedule: <br /> Anticipated Schedule <br /> (Business Da s) Task <br /> 3 —5 days Submittal of Revised Workplan to RWQCB <br /> 5 — 10 days RWQCB review and comment <br /> 7 - 10 days Contracting of Kleinfelder <br /> 5 — 10 days Revisions and RWQCB approval of final Revised Workplan <br /> 5 — 10 days Permitting and subcontractor scheduling* <br /> 3 —5 days Monitoring well installation and development <br /> 1 day Monitoring well sampling <br /> 21 days Laboratory analysis <br /> 10— 15 days Report preparation and submittal to Ms. Schmiedt <br /> 3 days Submittal of Limited Soil and Groundwater Investigation <br /> Monitoring Well Installation Report to RWQCB by Ms. Schmiedt <br /> * Kleinfelder has no control over the time required by a regulatory agency to review and approve a Revised <br /> Workplan and permit applications. <br /> Based on the above table, total time anticipated to complete the described scope of work is 18 <br /> weeks (4%i months) including field work, chemical analysis, surveying and report preparation. <br /> 27125/01 /STO3R657 Page 12 of 15 <br /> Copyright 2003,Kleinfelder,Inc. May 23,2003 <br />