My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
2096
>
2900 - Site Mitigation Program
>
PR0522097
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 1:37:56 AM
Creation date
5/26/2021 4:05:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522097
PE
2960
FACILITY_ID
FA0015058
FACILITY_NAME
SCHMIEDT SOIL SERVICE
STREET_NUMBER
2096
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22404021
CURRENT_STATUS
01
SITE_LOCATION
2096 S MAIN ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> • A 3- to*5-foot bentonite plug is placed above the sand pack to provide a seal against <br /> surface water infiltration and to reduce the potential for cement grout to infiltrate into the <br /> water. <br /> • The remaining annular space is filled to the surface with cement/bentonite grout. . <br /> • The wells are secured in an aboveground or underground locking stovepipe. The well <br /> heads may be enclosed in a water tight cement utility box set flush to the ground surface <br /> when located in a traffic area. <br /> A-3.2 Monitoring Well Development <br /> The wells are developed to reduce the effects of drilling on the formation and to increase the <br /> effective hydraulic radius of the wells. <br /> Monitoring wells are generally developed 24 to 48 hours after installation to allow the grout to <br /> set. Each well is first sampled with a clear disposable bailer to visually inspect for a hydrocarbon <br /> layer or sheen. If no product layer or sheen is observed on the water, the well is developed by <br /> surging, pumping or bailing. Surging along the screened interval of the well is performed to <br /> draw the sediment from the formation into the filter pack and the well, and to set the sand pack. <br /> Development continues until the discharge runs relatively clear of fines. Approximately 5 to 10 <br /> well volumes are generally removed from each monitoring well. Discharge water is stored in 55- <br /> gallon drums and left on site for later discharge or disposal by the client, depending on laboratory <br /> results. The drums are labeled with the date, well number, and a contact person and phone <br /> number. <br /> A-3.3 Equipment Decontamination <br /> To reduce the potential for cross-contamination between wells, developing equipment is washed <br /> in a trisodium phosphate or non-phosphate detergent solution and rinsed in distilled water or <br /> steam cleaned prior to use in the next monitoring well. <br /> A-3.4 Well Survey <br /> The locations of soil borings and monitoring wells, and the elevation of the top of the PVC <br /> casings are usually surveyed and tied into permanent markers, if readily available. Survey <br /> accuracy is 0.1 foot for the "x" and "y" coordinates and .01 foot for the 'Y' coordinate. The depth <br /> 27125.E01 /STO3R657 Page A-5 <br /> Copyright 2003,Kleinfelder,Inc, May 23,2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.