My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
2096
>
2900 - Site Mitigation Program
>
PR0522097
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 1:37:56 AM
Creation date
5/26/2021 4:05:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522097
PE
2960
FACILITY_ID
FA0015058
FACILITY_NAME
SCHMIEDT SOIL SERVICE
STREET_NUMBER
2096
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22404021
CURRENT_STATUS
01
SITE_LOCATION
2096 S MAIN ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k' ■ KLEINFELDER <br /> to static groundwater is measured from a set location at the top of the PVC casing (usually the <br /> north rim). The depth of water is then subtracted from the elevation of the top of the well casing <br /> to provide a groundwater elevation for each monitoring well location. <br /> A-4 SOIL AND GROUNDWATER INVESTIGATION <br /> A-4.1 Water Level Measurements <br /> Water level measurements are made in the wells prior to purging and sampling the wells. <br /> Measurement protocol is as follows: <br /> 1. Prior to obtaining water level measurements, the monitoring wells would be opened and <br /> allowed to equilibrate for a period of approximately%2 hour. <br /> 2. The water level probe is decontaminated in a trisodium phosphate or non-phosphate <br /> detergent wash, followed by a distilled water rinse, prior to use in each well. <br /> 3. Water level measurements are made using a conductivity-based water-level meter. <br /> Depth-to-water is generally measured from a surveyed mark on the north rim of the PVC <br /> well casing. <br /> The water level measurements are converted to elevations using the surveyed casing elevations. <br /> A-4.2 Groundwater Sampling <br /> Groundwater samples are collected from the monitoring wells at the site. The sampling protocol <br /> for each well is as follows: <br /> 1. Down-well equipment (pumps, bailers, etc.) is decontaminated by steam cleaning, or by <br /> scrubbing in a trisodium-phosphate or non-phosphate detergent wash followed by a <br /> distilled water rinse, prior to use in each well. Bailer cord is replaced prior to use in each <br /> well. <br /> 2. The depth to groundwater is measured using a conductivity-based water-level meter. <br /> 3. The volume of water in gallons standing in the well is calculated by subtracting the depth <br /> to groundwater measurement from the depth of the well and multiplying by the <br /> appropriate conversion factor(0.16 for 2-inch wells, and 0.65 for 4-inch wells). <br /> 27125.E01 /ST03R657 Page A-6 <br /> Copyright 2003,Kleinfelder,Inc. May 23,2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.