My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0522188
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 1:48:23 AM
Creation date
5/26/2021 4:17:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0522188
PE
2950
FACILITY_ID
FA0015130
FACILITY_NAME
MANTECA WASTE WATER QUALITY CONTROL
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phil Govea <br /> December 31, 2003 <br /> Page 2 <br /> Soil borings will be advanced to the target depth with a hand auger. Samples will be collected in <br /> brass sleeves driven into the bottom of the boring with a slide hammer. Soil borings will be back <br /> filled with native cuttings. The brass sleeves containing the samples will be sealed with Teflon tape <br /> and plastic caps, placed in plastic bags, and stored in a chilled cooler until delivery to the laboratory. <br /> Chain of custody procedures will be followed. <br /> Drilling and sampling equipment will be decontaminated after each sample to prevent cross- <br /> contamination of samples. Decontamination will consist of washing with a detergent, rinsing, and a <br /> final rinse with deionized water. <br /> LABORATORY ANALYSIS <br /> Samples will be delivered to a California-certified analytical laboratory within 24-hours of <br /> collection. Samples will be stored in a chilled cooler or refrigerator until delivery to the laboratory. <br /> Samples will be submitted with a five day turn around time. Analytes and laboratory methods are <br /> attached in Table 1. <br /> REPORTING <br /> A report will be prepared to present and evaluate the findings of the soil investigation. The report <br /> will include a discussion of the field work, including any deviations from this work plan; a <br /> presentation of the analytical results; and an evaluation of the soil beneath the sludge drying beds <br /> using the analytical results collected on September 24, 2003 and in January 2004. <br /> We appreciate the opportunity to provide engineering services for you. If you have any questions or <br /> comments, please contact us at (916) 641-1500. Unless otherwise directed, we will proceed with <br /> the proposed work plan. <br /> Sincerely, <br /> NOLTE and ASSOCIATES, Inc. <br /> q ,, --/� <br /> Dave Richard, P.E. Michael Wademan,P.E. <br /> Project Manager Project Engineer <br /> NASA1224\Correspondenc6sludge beds soil workplan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.