Laserfiche WebLink
L & M OPERABLE UNIT- FIRST QUARTER 2012 SITE STATUS, REMEDIAL SUMMARY, <br />AND GROUNDWATER MONITORING REPORT <br />Status of Remediation Activities <br />April 30, 2012 <br />I:\Tidewater\TW Stockton (P2A)\QMRs\2012\1Q12\1Q12 QSSR QRSR QMR Stockton_FINAL.doc 3.2 <br />3.2 L&M OU AND APARTMENT SOIL VAPOR EXTRACTION SYSTEMS <br />3.2.1 L&M OU and Apartment Soil Vapor Extraction Systems Summary <br />The L&M OU SVE (SVE) and Apartment SVE (ASVE) systems have run near continuously <br />since May 31, 2007. The SVE system is comprised of horizontal vapor wells: SVE-1 through <br />SVE-11, a 100-gallon liquid/vapor separator, and a Solleco 500 cfm vapor extraction system <br />with a Roots URAI 59 20-hp positive displacement blower. The ASVE system is comprised of <br />horizontal wells (ASVE-1 through ASVE-6), a 100-gallon liquid/vapor separator, and a Solleco <br />250 cubic feet per minute (cfm) vapor extraction system with a Roots URAI 56 10-hp positive <br />displacement blower. Vapor from both the SVE and the ASVE systems is abated with a <br />750 scfm thermal oxidizer. Since May 31, 2007 the 750 scfm SVE and ASVE vapor abatement <br />system has been operated under SJVAPCD permit number N-4878-2-0. <br />3.2.2 L&M OU and Apartment Soil Vapor Extraction Systems Operational Data – 1Q12 <br />During 1Q12 the SVE system was approximately 100% operational (92 out of 92 days) and the <br />ASVE system was approximately 81% operational (74 out of 92 days). The ASVE system <br />experienced a period of downtime due to the failure of a transfer pump. The transfer pump and <br />associated plumbing was replaced on February 27, 2012. <br />3.2.3 L&M OU Soil Vapor Extraction System Analytical Data – 1Q12 <br />During 1Q12 (December 15, 2011 through March 16, 2012) the SVE system removed <br />approximately 55.4 lbs. (9.1 gallons) of TPHg, 0.050 lbs. (0.007 gallons) of benzene, and 0.11 <br />lbs. (0.02 gallons) of MtBE from the subsurface. To date the SVE system has removed <br />approximately 4,335 lbs. (711 gallons) of TPHg, 5.17 lbs. (0.72 gallons) of TPHd, 2.96 lbs. (0.40 <br />gallons) of benzene, and 5.96 lbs. (0.96 gallons) of MtBE from soil vapor beneath the L&M OU. <br />Historical SVE system operations and analytical data are presented in Tables 21 through 24. <br />3.2.4 Apartment Soil Vapor Extraction System Analytical Data – 1Q12 <br />During 1Q12 (December 15, 2011 through March 16, 2012) the ASVE system removed <br />approximately 15.3 lbs. (2.5 gallons) of TPHg, 0.125 lbs. (0.017 gallons) of benzene, and <br />0.28 lbs. (0.05 gallons) of MtBE from the subsurface. To date the ASVE system has removed <br />approximately 2,659.7 lbs. (436.0 gallons) of TPHg, 10.19 lbs. (1.42 gallons) of TPHd, <br />2.643 lbs. (0.360 gallons) of benzene, and 5.55 lbs. (0.90 gallons) of MtBE from soil vapor <br />beneath the Delta View Apartments. Historical ASVE system operations and analytical data are <br />presented in Tables 18 through 20.