My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
56
>
2900 - Site Mitigation Program
>
PR0526394
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 11:32:38 AM
Creation date
5/27/2021 10:56:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0526394
PE
2960
FACILITY_ID
FA0017859
FACILITY_NAME
STOCKTON REDEVELOPMENT AGENCY
STREET_NUMBER
56
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737003
CURRENT_STATUS
01
SITE_LOCATION
56 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2012 TIDEWATER STOCKTON WORK PLAN FOR SEPARATE PHASE HYDROCARBON REMOVAL <br />AT THE WATERFRONT TOWERS PARKING LOT <br />____________________________________________________________________________ <br />i <br />Table of Contents <br />1.0 INTRODUCTION ................................................................................................................ 1 <br />1.1 Site Description................................................................................................................... 1 <br />1.2 Site and Vicinity Background............................................................................................... 1 <br />1.3 Regional and Local Geology/Hydrogeology ........................................................................ 2 <br />2.0 RECOMMENDED REMEDIAL ALTERNATIVE.................................................................. 4 <br />3.0 REMEDIAL ACTION IMPLEMENTATION.......................................................................... 5 <br />3.1 Remedial Design................................................................................................................. 5 <br />3.2 Permitting and Access Agreement...................................................................................... 6 <br />3.3 Site Health and Safety Plan ................................................................................................ 6 <br />3.4 Pre-Construction Activities.................................................................................................. 6 <br />3.5 Construction Activities......................................................................................................... 7 <br />3.5.1 Product Removal Remediation System Installation .............................................. 7 <br />3.5.2 Waste Profile and Disposal .................................................................................. 7 <br />3.6 Periodic Monitoring Reports................................................................................................ 7 <br />4.0 OPERATION AND MAINTENANCE................................................................................... 8 <br />4.1 Data Collection.................................................................................................................... 8 <br />4.2 Operation and Maintenance Schedule ................................................................................ 8 <br />4.3 Shutdown Criteria ............................................................................................................... 9 <br />5.0 SCHEDULE.......................................................................................................................10 <br />6.0 LIMITATIONS AND CERTIFICATIONS.............................................................................11 <br />LIST OF FIGURES <br />Figure 1 SITE PLAN <br />Figure 2 SITE PLAN WITH PROPOSED REMEDIATION COMPOUND LOCATION <br />LIST OF APPENDICES <br />Appendix A SUMMARY OF PREVIOUS INVESTIGATIONS
The URL can be used to link to this page
Your browser does not support the video tag.