Laserfiche WebLink
MONITORING WELL INSTALLATION WORKPLAN <br />VENTRANS MEMORIAL PARK <br />TABLE OF CONTENTS <br />1.0 GENERAL INFORMATION 1 <br />1.1 Purpose 1 <br />1.2 Site Description 1 <br />1.3 Physical Setting 1 <br />1.3.1 Site Topography 1 <br />1.4 Local Geologic and Hydrogeologic Conditions 1 <br />1.4.1 Regional Geology 1 <br />1.4.2 Local Geology 2 <br />1.4.3 Hydrogeology 2 <br />1.5 Proposed Monitoring Well Location 2 <br />2.0 DRILLING DETAILS 3 <br />2.1 On-Site Supervision 3 <br />2.1.1 Pre-Drilling Permits 3 <br />2.1.2 Traffic Plan 3 <br />2.1.3 Safety Plan 3 <br />2.2 Drilling Equipment and Techniques 3 <br />2.2.1 Borehole Installation 3 <br />2.2.2 Monitoring Well Installation 4 <br />2.3 Equipment Decontamination 5 <br />3.0 WELL DEVELOPMENT 5 <br />4.0 REPORT OF WELL INSTALLATION 5 <br />5.0 LIMITATIONS 6 <br />APPENDIX A Plate Number <br />Vicinity Map 1 <br />Topographic Map 2 <br />Well Installation Detail 3 <br />A <br />902 Industrial Way • Lodi, CA 95240 • 209.367.3701 • Fax 209.369.4228 ©2008 Neil 0. Anderson & Associates, Inc.